1.工作前穿戴好所規(guī)定的勞動(dòng)用品,并認(rèn)真檢查鍋爐給,排水,供氣管道附件,安全閥、壓力表、水位計(jì)是否靈敏好使,確認(rèn)安全后,方可進(jìn)行工作。 2.鍋爐水位標(biāo)準(zhǔn)高水位不超過三分之二,很低水位不低于三分之一,一般情況,保持在1/2以上。 3.上水時(shí)要雙手操作,一手先開啟水門,隨之另一手開啟注水器汽門,水自然進(jìn)入爐內(nèi)。停止時(shí),應(yīng)先關(guān)閉汽門,然后關(guān)水門,在開關(guān)汽門時(shí),臉部必須躲開正面,以免汽水沖出造成事故。 4.鍋爐在運(yùn)行中,要注意檢查各部,觀察壓力和水位。如超壓或缺水時(shí),必須停爐,將灰扒到前邊,稍稍注入冷水,但不準(zhǔn)大量注入冷水,以免發(fā)生事故。 5.鍋爐在運(yùn)行中,司爐工不準(zhǔn)擅自離開崗位,夜班工作時(shí),不準(zhǔn)打瞌睡,更不準(zhǔn)睡覺,以免發(fā)生事故。 6.鍋爐排污,每班必須進(jìn)行一次,在排污前適當(dāng)調(diào)整水位,稍微高2/3,然后進(jìn)行排污。 7.水位表每班必須沖洗一次。沖洗時(shí),要按規(guī)定程序,先關(guān)閉水閥,打開排污閥,沖洗汽閥,這時(shí)注意汽的來路是否堵塞。然后關(guān)閉汽閥,這時(shí)注意水的來路是否堵塞。沖洗水閥時(shí),有水變汽為止,時(shí)間稍長些,才能保證不出假水位。 8.鍋爐用煤必須要檢查,防止煤中有雷管火藥等爆炸物品投入爐內(nèi),以防爆炸危險(xiǎn)。 9.運(yùn)行中要經(jīng)常檢查機(jī)械設(shè)備和電動(dòng)機(jī)外殼溫度,如機(jī)械有故障或電動(dòng)機(jī)發(fā)熱超過60度,立即停機(jī)檢修。 10.鍋爐正常運(yùn)行時(shí),汽壓不得超過規(guī)定工作壓力,安全閥每周檢驗(yàn)一次。
中譯英: 1 Work wear prescribed by the labor supplies, and carefully check the boiler, drainage, gas pipeline accessories, safety valve, pressure gauge, water level meter is a sensitive so to confirm the safety, we can work. 2 Boiler water level the highest level of not more than 2/3, the lowest level of not less than 1/3, in general, maintained above 1/2. 3 Sheung Shui to operate with two hands, one hand to open the gate, then the other hand open water valve, water enters the furnace. Stop, first close the valve, then close the Watergate, the switch valve, the face must avoid the positive, so as not to pop out accident. 4 Boiler in operation, pay attention to the inspection department, observing the pressure and water level. Such as super pressure or water, must stop furnace, grey chop to the front, slightly into the cold water, but not poured into cold water, to avoid accidents. 5 Boiler in operation, fireman to leave post, night work, not to doze off, but are not allowed to go to sleep, to avoid accidents. 6 Boiler blowdown, every class must have a, in sewage before proper adjustment of water level, slightly high 2/3, and then discharge. 7 Water level gauge in each class must be rinsed again. The flushing time, according to the provisions of procedure, to close the valve, open the drain valve, flushing valve, then pay attention to steam route is blocked. And then close the valve, then pay attention to the water source is blocked. Flushing water valve, water changes into steam, slightly longer, to ensure that no false water level. 8 Coal used by the boiler must check, prevent coal powder explosive detonator into the furnace, in order to prevent the risk of explosion. 9 Operation should always check the mechanical equipment and motor shell temperature, such as mechanical failure or motor fever over 60 degrees, immediately stop machine overhaul. 10 The normal operation of the boiler, the steam pressure shall not exceed the stipulated working pressure, safety valve inspection once a week.
聯(lián)系人:陳先生
服務(wù)熱線:158 7870 3621
CopyRight 廣西中立源能源技術(shù)有限公司 All Rights Reserved. 桂ICP備2022001346號 a>
電子郵箱:1291250037@qq.com
聯(lián)系地址:廣西南寧市青秀區(qū)賢賓路一號五樓